Non-Destructive Testing (NDT) Activities

Non Destructive Testing NDT Upon completion of oil and gas piping spools, the fabricated pipe spools need to be tested for their integrity to be used

Non-Destructive Testing (NDT) Activities

Non Destructive Testing

Upon completion of oil and gas piping spools, the fabricated pipe spools need to be tested for their integrity to be used in oil and gas mediums. The most common technique for testing these pipe spools is NDT. (non-destructive testing). Some of the most common NDT. 

Techniques are radiography test (RT), ultrasonic test (UT), magnetic particle test (MPT.) and dye penetration test (DPT). Many other advanced NDT. methods are available as well, but the above are the most used tests in oil and gas projects. 

As such, fabrication facilities are not encouraged to perform these tests internally due to conflict of interest. Most of oil and gas clients insist the fabrication contractors must have independent third-party NDT. companies to carry out these tests. Thus, NDT. activities have become the most important testing activity in the piping fabrication landscape. Many a time, poor performance of these independent NDT. companies has led to project delays, additional testing costs and other associated issues in the project. 

Thus, it is of real importance to understand the various key aspects of NDT. scope of activities and its requirements to ensure that these activities are carried out with due diligence. In this section, the most common NDT. techniques and the critical points to be looked at for successful NDT. work completion are explained in detail.

1 Non-Destructive Testing (NDT) Selection

  • NDT subcontractor selection should be done well in advance, before the fabrication works start at the project site. It is not advisable to start working on the NDT subcontractor selection work after the fabrication works have started. This will create accumulation of work and delay in carrying out the required NDT work, including identification and traceability issues.
  • A minimum of two subcontractors need to be selected for the project based on the scope of NDT work involved in the project. This is to ensure issues, if any, related to the single N.D.T. subcontractor, such as NDT personnel shortage, payment-related issues, etc.
  • The potential NDT subcontractor should have a PETRONAS approved license to carry out NDT work in the project. Care should be taken to check the scope of work mentioned in the PETRONAS license. Absence of ‘PETRONAS’ license and NDT related scope of work in the subcontractor’s current license will lead to rejection by PETRONAS/client representatives. In some cases, PETRONAS license renewals have not been done by the subcontractors, which is again an issue. In a nutshell, the selected subcontractor should possess a valid PETRONAS license with the required NDT scope of work.
  • It must be ensured that the subcontractor has the required NDT equipment and manpower. If not, it will lead to uncertainty in terms of continuous engagement and on emergency needs.
  • A check and balance on NDT quoted prices versus market prices versus budget available for the project needs to be worked out. This is to avoid cost overruns due to the NDT scope of work. If the budget allocated is less than the anticipated scope of work, the PM must be informed about the possible cost overruns in this area to avoid cost related issues later.
  • NDT subcontractors who can cover all the NDT scope of work, such as RT/UT/MT/PT/ P.M.I./hardness testing and PWHT, should be selected. If the NDT requirements are very bigger projects, it is always advisable to have subcontractors who can cover the entire scope of work related to NDT. This will help to avoid delays and time/effort spent in getting the approval from clients to engage NDT subcontractors.
  • NDT subcontractors should be finalized at least one month before the start of actual fabrication work. This is to ensure on-time submission of all the related documents to the client and to facilitate on-time starting of NDT work at the site. Some subcontractors may not provide their NDT procedures if the work order is not issued to them. If fabrication works are started before selection of the subcontractors, it will delay the work.
  • The selected subcontractor must submit their company profile, company’s track record, previous experience in similar kind of projects and similar scope of work, etc., to avoid surprises later.
  • The duration of employment of the NDT subcontractor must be specified in the work order clearly, and the same must be monitored and controlled to avoid cost overruns.
Non-Destructive Testing (NDT) Piping

2 NDT Procedures

  • Based on the NDT scope of work, the NDT procedures must be identified.
  • Identified procedures must be obtained from N.D.T. subcontractors and reviewed internally for their correctness prior to submission to client.
  • The identified NDT procedures must be approved by the client prior to start of fabrication work.
  • The minimum procedures required are RT/UT/MT/PT/P.M.I./hardness testing and PWHT.
  • The selected subcontractor for NDT work must submit the identified procedures within a week of obtaining the work order from the PCR.

3 Client Approval For NDT Procedures

  • Prior to starting NDT work, all the identified NDT procedures must be approved by the client. Comments, if any, by the client during the approval process must be resolved prior to the start of NDT work.
  • The client must approve the submitted NDT procedures within two weeks to avoid delay in approvals.
  • Close monitoring of NDT approvals by the client is essential for the timely starting of NDT operations in the project.

4 Calibration of NDT Equipment

  • The NDT subcontractor must submit the calibration register and calibration certificates to the PCR. together with the NDT procedures prior to mobilization of NDT personnel and equipment to the site.
  • The NDT equipment must be provided with calibration status identification for client’s verification.
  • The client’s approval must be obtained for NDT equipment calibration records to avoid issues at a later stage. Calibration frequency and expiry of the NDT equipment must be monitored to ensure timely renewal and fitness for use.
  • Traceability of the NDT equipment calibration certificates to national and international standards must be ascertained.

Name

Fire Protection,2,Mechanical Engineering,5,Piping,4,Rotating,6,
ltr
item
Ghani Mechanical Engineering: Non-Destructive Testing (NDT) Activities
Non-Destructive Testing (NDT) Activities
Non Destructive Testing NDT Upon completion of oil and gas piping spools, the fabricated pipe spools need to be tested for their integrity to be used
https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEhHcLz3LJFmhr1NrIMSWH2Xabg7me8syYR_nYwLy2_iMImuepsCVEx-3z1tjscQ4I0rtSi3Mr2MD0m0Jn2GuxLm1xLVXgk2WiZHIX6ngDhCUiDyY7XDfXbtmNBhKVXET6vJWx4FpdtURwRwR2GCx4ivaKXkLCR5EwJQ0PGrEtUOQU_FVRaMnX22udV8cQYA/w400-h311/Non-Destructive%20Testing.webp
https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEhHcLz3LJFmhr1NrIMSWH2Xabg7me8syYR_nYwLy2_iMImuepsCVEx-3z1tjscQ4I0rtSi3Mr2MD0m0Jn2GuxLm1xLVXgk2WiZHIX6ngDhCUiDyY7XDfXbtmNBhKVXET6vJWx4FpdtURwRwR2GCx4ivaKXkLCR5EwJQ0PGrEtUOQU_FVRaMnX22udV8cQYA/s72-w400-c-h311/Non-Destructive%20Testing.webp
Ghani Mechanical Engineering
https://www.ghanimecheng.my.id/2023/07/non-destructive-testing-ndt-activities.html
https://www.ghanimecheng.my.id/
https://www.ghanimecheng.my.id/
https://www.ghanimecheng.my.id/2023/07/non-destructive-testing-ndt-activities.html
true
2817346592992621225
UTF-8
Loaded All Posts Not found any posts VIEW ALL Readmore Reply Cancel reply Delete By Home PAGES POSTS View All RECOMMENDED FOR YOU LABEL ARCHIVE SEARCH ALL POSTS Not found any post match with your request Back Home Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sun Mon Tue Wed Thu Fri Sat January February March April May June July August September October November December Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec just now 1 minute ago $$1$$ minutes ago 1 hour ago $$1$$ hours ago Yesterday $$1$$ days ago $$1$$ weeks ago more than 5 weeks ago Followers Follow THIS PREMIUM CONTENT IS LOCKED STEP 1: Share to a social network STEP 2: Click the link on your social network Copy All Code Select All Code All codes were copied to your clipboard Can not copy the codes / texts, please press [CTRL]+[C] (or CMD+C with Mac) to copy Table of Content